Houston – – October 14, 2026 -- Two Williston Basin wells operated by Chord Energy have run for more than a year without a sand-related pump failure after a single SandBONDTM treatment, extending pump run life 5.5× and 4.7×, TenEx Technologies reported. Both pumps are still running with stable performance, and the wells recorded zero production loss.