By Editor , 25 September 2026
Nscale Raises $3.36bn in Convertible Notes Led by Third Point, NVIDIA

London – – September 25, 2026 -- Nscale Limited has closed a $3.36 billion convertible loan note financing led by Third Point, with NVIDIA committing an additional $1 billion tranche expected to fund in mid-November 2026.

Nscale secures $2.36 billion at initial closing, with NVIDIA's $1 billion tranche to follow

The financing structure splits into two tranches: a $2.36 billion initial close and a subsequent $1 billion commitment from NVIDIA. Goldman Sachs & Co. LLC acted as placement agent for the round.

By Editor , 21 September 2026
LG Energy Solution BESS Wins NVIDIA DSX Ready Qualification

Seoul – September 21, 2026 -- LG Energy Solution said its Battery Energy Storage System (BESS) has qualified as NVIDIA DSX Ready BESS, a designation reserved for partner products meeting NVIDIA's DSX reference design requirements for AI factory power infrastructure.

By Editor , 21 September 2026
EPB Launches IonQ Forte Enterprise Quantum Computer in Chattanooga

Chattanooga – September 20, 2026 -- EPB has launched the IonQ Forte Enterprise quantum computer at its EPB Quantum Center, creating what the utility calls America's first commercial hub combining quantum computing and networking under one roof.

By Editor , 20 September 2026
78% of US Utilities Deploy AI as Grid Reliability Tops Net-Zero Priority

Boston – September 19, 2026 -- Seventy-eight percent of U.S. utility innovation leaders are now deploying or operationalizing artificial intelligence to manage interconnection demand, as AI data centers strain power grids nationwide, according to National Grid Partners' third annual Utility Innovation Survey.

By Editor , 20 September 2026

Pasadena, Calif. – September 19, 2026 -- PrismML has released Bonsai 2 27B, a ternary-compressed version of a 27-billion-parameter multimodal model that runs at just 5.9 GB while retaining 98.2% of its full-precision counterpart's benchmark performance.

Ternary compression shrinks memory footprint by more than 9x

Built on Qwen3.8 27B, Bonsai 2 27B reduces the model's memory requirement to 5.9 GB, a reduction of over nine times compared with the full-precision original. The model contains 27.8 billion parameters and was trained using Google v5 TPUs.

By Editor , 20 September 2026
Delta Electronics Speeds NVIDIA DSX AI Factory Rollouts with 800 VDC Tech

Fremont – September 19, 2026 -- Delta Electronics announced a system-level infrastructure approach to accelerate deployment of AI factories built on the NVIDIA DSX AI Factory Platform, integrating power delivery from onsite energy sources down to the chip level to raise token output per megawatt.

By Editor , 20 September 2026
Lead Image
WAN AICHEF ULTRA Named 2026 IDEA Finalist for 'Load and Go' AI Cooking

LAS VEGAS – September 19, 2026 -- WAN AICHEF ULTRA, an AI-powered cooking system, has been named a Professional Category Finalist in the 2026 International Design Excellence Awards (IDEA), presented by the Industrial Designers Society of America.

By Editor , 18 September 2026
Qedma Brings Quantum Error Mitigation Software to NVIDIA CUDA-Q Platform

Toronto and Tel Aviv – September 17, 2026 -- Qedma Quantum Computing has integrated its QESEM error mitigation software with NVIDIA's CUDA-Q platform, giving users the ability to run larger and more complex quantum workloads on Quantinuum hardware without altering existing programming workflows.